data mining processing. computer, graphs, diagramsPortfolio indicators or Key Performance Indicators are paramount in having a global view of the organization and its project performance. In this article, we review the most important ones.

KPI 1: Internal demand in number of days / workers

 When your organization manages internal projects, whether it be change projects or new product development, the client and the project sponsor will from within the company. That is why, when poorly managed, internal project portfolios can become crazy races, causing disputes between the various promoters as they try to get ahead of each other in order to increment the team staff, acquire additional funding or the favour of the board of directors. 

Try ITM Platform and know the status of your project portfolio at all times 

Therefore, it is very important to be clear, at all times, about what the total internal demand of each area of ​​the organization is generating for its different projects. It is true that you can rely on what is the largest project or what are the criteria to incur costs, but while the first is a partial indicator, the second does not allow you to see the development of the planned workload. The internal client demand indicator is the perfect KPI for this purpose. Thanks to this, you will know how many days of work each department or functional area of ​​your company generates in the project teams. This information is not only valuable for the CIO and the CEO, but can also help you establish a maximum demand limit for days worked related to the organization (throughout time).

components/total budget

Of course, if there are transversal projects that involve several departments, it is essential to have a good system of project allocation, so that the information contained in the system is not distorted and the indicator is actually useful.

KPI 2: Employees by professional profile

If your organization relies on consultants for your projects, it is very possible that the available skills vary greatly over time. Today you could have four experts in programming JavaScript and none in four months. Hence, it is important to be clear at all times what the composition of your human resources by professional profiles are. The evolution of this indicator will facilitate the work of your PMO, the planning of resources as well as the identification of gaps or oversupply. In addition, graphics are very useful for the management team, as they easily communicate the structure of the personnel involved in projects.

the structure of the personnel involved in projects, diagrams, percentages

KPI 3: Estimating effort

The previous indicator would do little to manage the portfolio if we could not anticipate the future needs of certain profiles. For this, it is essential to have a view of the estimated efforts in the coming months. Each project manager takes into account where the greatest effort is concentrated in for the projects for which he is responsible for, but very few have the necessary information to know if the "hot seasons" of each project coincide. From such a chart, portfolio managers would know when there is a greater risk of scarcity of certain skills and can plan accordingly. In the given example, the busiest months are June, September, July and April, respectively.

external and internal estimated effort

KPI 4: Budget by objectives

budget by objetives, diagram, percenages

Within the economic indicators, one of the most interesting from the point of view of the portfolio is the one that indicates the aggregate investment that is being allocated to each one of the objectives of the organization. This indicator should serve as confirmation that the management of the project portfolio is following the strategic guidelines established by the highest management bodies. If a goal has the highest priority, it is logical that it is receiving the highest share of investment. Any contrary discrepancy must have sufficiently justified grounds. In the given example, if sales growth were more important to managers than increased operational efficiency, the portfolio should be revised to ensure that total investments in these areas correspond to the priorities. It is possible that the operational improvement currently has a very expensive project of change but of limited duration, after which completion the percentages would be re-adjusted.

KPI 5: Process budgeting

process budgeting, diagram, percentages
What business processes are absorbing more investment? In conjunction with the domestic demand indicator, this indicator leads to optimization, cost reduction and the elimination of redundancies and inefficiencies. Processes that are considered marginal and low value-added often consume resources for administrative and maintenance reasons that are difficult to reduce. However, it is crucial to know what the natural or average value of this indicator is and to ensure that it never rises above it. In the given image, assume that the average cost of storage for 'GlobalCorp360' is at 8%. If at any time it rises above 12% for no apparent reasons, this becomes alarming and yields more than enough evidence to submit the process to an audit.

KPI 6 and 7: Budget by component and current cost per component

Budget by component and current cost per component
The simplest indicator, which shows the budgets for each of the projects involved, remains the most useful for the portfolio manager. As with the calendar for an event manager, the director of a portfolio should always have before him a written reference of the budget of each project. The person responsible for a portfolio must demand the highest precision of the budgets and the costs incurred by each project. For the same reason, it is essential to have a solution that, like ITM Platform, updates the information immediately each time a new invoice is registered, without having to wait for periodic reports.

Receive the latest blogs directly into your inbox

 

businessman leaving work to go to the beach, holidays, ball, palm treeThis is a guest article by Elizabeth Harrin. Elizabeth has recently published a review of ITM Platform on her blog. This article contains affiliate links that don’t cost you extra.

When I’m on holiday I want to be, you know, actually on holiday. Enjoying my vacation time, chilling out with a cocktail and a barbeque and playing ball with my kids. I don’t want to be checking emails, dealing with phone calls from my project sponsor or still doing project reports from the cabin in the woods because no one else can possibly write them in my absence.

I know our roles as the project manager is important, but the project can’t stop when we’re away. It’s not good for you to be using your relax and recharge time to do work. You deserve a break.

However, it’s easy to say. It’s less easy to do, because so much of the project management part of our roles isn’t straightforward to delegate to someone else, and often we don’t have anyone to delegate it to. That example of writing project reports while I was on holiday: that actually happened. The report wasn’t even that good because I wasn’t in touch with the team to get a real update of what was going on.

So how can you get a proper break without your project falling apart without you? Here are 5 stress-busting tips for before your vacation so you can go away and enjoy yourself with confidence.

1. Get On Top of Your Schedule

It feels a lot more comfortable to go away if you are leaving your project schedule in a good state.

An up-to-date schedule means that everyone will know what tasks they need to work on while you are away. To be honest, they’ve probably got an idea of what they should be doing anyway, but having it there accurately on the schedule means they have no excuse!

If you still have tasks without assigned resources, assign someone so that it’s on their radar while you are out of the office. If you need to, take some time before you go away to explain what the task is all about and how you expect it to be done. Use that conversation as a way to confirm the delivery date with them as well and to check that your estimate is realistic.

2. Handover the Important Stuff to Someone Else

If you are lucky, there won’t be anything important happening while you are away. You’re a project manager, so you’ve probably planned your holiday at a time where it is going to have a minimal impact on the project.

Unlike me, who went on maternity leave just before a two-year software development project went live (that was some handover).

However, if there is anything that is outstanding or is presenting as an issue, brief someone about it. You might have a number of people you talk to: don’t feel that your handover has to be to one single person. Your project sponsor might pick up some of the issue management. A workstream leader might chase down outstanding tasks. Your project coordinator might be briefed about staying on top of the action log.

Write down as much as you can when you’re preparing your handover because people forget. Include key contact details of people who can help them so that they don’t automatically speed dial you with problems.

You can also let them know what they can ignore. Someone might complete a project task, for example, but if it’s not on the critical path the work could sit there until you come back to deal with it. Try to set some clear guidelines about what should be actioned or progressed and what can wait. Trust me, a lot of it can wait.

Try ITM Platform for free

3. Set Your Out Of Office Message

Set expectations from the beginning about you being out of the office. Change your voicemail message so that people calling you hear that you are away from the office. Add an autoresponder to your email system so that people who contact you get a response saying that you are away. This all helps to manage your colleagues’ expectations so that they aren’t frustrated that you aren’t replying straight away (especially if that is what they are used to). It also gives you some breathing room as you’ll know people are being told where you are and what to expect in terms of a response.

If you have a deputy or someone who can handle the majority of your tasks, or urgent queries then include their details in your messages. Check with them first though! Personally I wouldn’t set up a rule to forward messages on, but if that’s the culture of your organization then get that created and working before you leave on your last day.

Remember to turn off your out of office responder and reset your voicemail when you get back. Just put a note in your diary to do it on the day you come back from holiday, and then no one will leave you voicemails saying that your message is out of date.

4. Talk To Your Sponsor

Even if you aren’t handing off any work to your sponsor, pop some time in their calendar to meet with them and discuss the plans for when you are off. Let them know your vacation dates and who they can turn to in an emergency.

If you are happy for them to contact you while you are away, let them know – and give them your vacation time contact details if necessary.

The aim here is for you to go away knowing that your sponsor is confident that everything is in hand and that you have it all under control, even if you aren’t physically there for a week or two. Again, this is all about managing expectations.

5. Plan Your Return

Block out the morning of your first morning back. Book yourself out so that your diary is full and no one tries to book you to attend a sneaky meeting.

This is your time to catch up. Review all your emails, get back into the swing of things, log into your project management software and check on the team’s progress. Having this buffer on your first day back is a huge stress reliever. Even if you do spend some of that time on the phone to the help-desk having forgotten the password for your laptop.

With all these plans in place, you can go away and have a fantastic time on your vacation. As much as it might feel like the project will grind to a halt without you there, it probably won’t happen. The chances of you coming back to a total disaster after a fortnight off are remote, especially if you’ve worked through these tips and put your plans into action for a smooth transition away and then back.

The team will no doubt be glad to have you back and I expect you’ll have a stack of emails to read, invoices to approve and tasks to do. But at least your forward planning will have made for a stress-free holiday and time to recharge before you get back into the daily management of your project.

Receive the latest blogs directly into your inbox

 

fashion trend colors seamless pattern For change to be carried out under optimal conditions, it must influence a series of attitude changes in the workforce to ensure that it is carried out successfully, both individually and collectively.

However, it may be complex to produce changes in business organisations and its working methodologies, both in large and small corporations.

Some studies indicate that approximately 70% of attempted company change or transformation end in failure. This is not surprising, because human beings, by nature, are conformist and tend to be resistant to change.

According to a 2016 study by consulting firm McKinsey, there are four building blocks that determine the influence on employee behaviour.

All the models focus in the mindset of the worker and assume that the worker will accept the change if he observes or finds positive attitudes around his or her working environment. Therefore, the exposition of each of the attitudes will begin by articulating a phrase that summarises the worker's feeling towards them. Below, we will analyze why each of the attitudes work.

Text "I will change my mind-set and behavior if..."

Role Modelling

"I observe that my colleagues, leaders, and in general the whole team behave differently."

This theory works because people tend to imitate the attitudes of a group and to integrate within it, both consciously and unconsciously.

If the whole team behaves in a certain way, the tendency is that all workers try to adopt the same attitudes to blend in.

All new members will be conscious of the active working model and, therefore, will adopt it immediately.

Knowledge, understanding and conviction

"I understand what is being asked of me and it makes sense to me" 

In a company, or in any other organization, there are critical voices, and they must always exist. They are necessary for both individual and collective growth. 

However, both criticisms as well as the adoption of collective standards, especially among highly qualified teams, should not be destructive but constructive. In this way, the company can present a certain flexibility to adapt to the specific needs and methodologies of each of its employees. 

At the same time, as they are rules that are not completely imposed, but are collectively established, understood and accepted by all workers, compliance is guaranteed. 

The worker should not understand the new methodologies of work as an imposition but as a necessity that makes his work more productive and efficient. 

Development of talents and abilities

"I have the skills, the talent and the opportunity to adopt the new working methodologies."

In order to adopt new working methodologies, firstly, it is necessary to learn to use them from a theoretical point of view and then proceed to a practical tutored period. To do this, the company must conceive the adoption of new work methodologies and new project management systems as an investment for the future. After all, the work, products or services developed by the company are channelled through projects, so working on their optimization means facilitating the success of the company as a whole.

In addition to the worker feeling that what is good for the company is good for him, he must also feel accompanied and guided during the process of change. Therefore, it is necessary to teach already established workers to adopt to the new working methodologies.

Reinforcement of adopted attitudes

"I note that structures, processes, and systems support the change that is required of me."

The dissonance between the demands of behavioural change and the infrastructure of technology and methodologies can definitely inhibit not only motivation for change, but the employee's own commitment to the organization and leadership. On the other hand, if the employee is able to see that the required change is not only a necessary consequence of the organization's processes, but that its new behaviour is prolonged and supported by those same processes, leadership will be perceived as responsible, considerate and capable to take into account all the details.

If workers observe, feel, and understand that change leads to a more successful business and that this is beneficial to them, they will be happy to continue adopting new work systems. Therefore, the greater productivity achieved through change must be transferred to their daily work and demonstrated through data and also through improvements in their daily lives.

 

Receive the latest blogs directly into your inbox

 

abstract vector 4 steps infographic template in flat style for layout workflow scheme, numbered options, chart or diagramITM Platform is specifically designed to support multi-project organizations: our client base ranges from small consultants to large corporations, such as Grupo Lala, the first manufacturer of dairy products in Mexico, or Spire Healthcare, the second largest private healthcare provider in the United Kingdom.

Why do they choose us? They say that among all the tools that allow both planning and executing projects and managing portfolios, it is not easy to find solutions that are useful for both project managers and PMO directors at the same time in the same environment.

So when someone asks us if we can help them get their Project Management Office up and running, the answer comes as natural as the smile you give an old friend. In this article we discuss the main reasons why ITM Platform is a great ally to support the activities of a PMO.

Try ITM Platform for free

1.  Capture your organization

Any organization can reflect the structure of their teams in a very short time. Whether it's a functional organizational structure based on departments, a purely project-based structure, or a matrix-type intermediate structure, the first step for your organization to start managing your ITM Platform projects is to map which department, project or area of ​​competence belongs to each member. 

In fact, flexibility is achieved by combining two criteria: 

  • Organizational units, comparable to traditional departments
  • Working groups, which allow cross-grouping. For example, you can create project teams that have a certain permanence character. These groups can also be used to bring experts together by competencies so that project and PMO managers can easily assign them to specialized tasks and groups. 

Once you have reflected the departments and functional units, you can continue defining the details that will allow ITM Platform to control the costs and progress of your projects in real time:

  • Hourly rates: How much do your team members charge per hour? How much do external consultants charge? What is the overhead of a workgroup compared to a technician? By specifying the fees for each type of expert, ITM Platform allows you to reflect the actual costs of your projects with the desired level of detail.

2. Capture your processes

ITM Platform allows you to capture any methodology you are using in your organization for project management. Although the software is intended to capture the components, processes and groups recommended in standards such as PMBOK or Prince2, especially when it comes to project integration management, it is not necessary to strictly follow these manuals to properly manage the projects. The focus of the tool is to provide a flexible technological service that allows the capture of all relevant information and capture the process flows that exist in each organization. 

3. Connect to your teams

ITM Platform empowers all project teams, from the highest level director to the young talented new arrivals.

  • Management: Those who are interested in seeing key metrics such as the degree of progress of the projects by each program, the level of risk exposure of the projects, or the composition of costs per manpower according to the provider can use the customizable scorecards and reports.
  • PMO portfolio managers, program managers and PMO directors

The people that connect the company's strategy to day-to-day project management are those that most directly benefit from the ITM Platform. Let us see some different aspects: 

Shared resources

In situations with cross-cutting projects shared by experts and analysts from different functional areas or departments, it is common practice for one of the PMO director's main attributions to be to avoid conflicts when using shared resources: professionals in high demand due to them being very qualified and are irreplaceable in their specialty. Conflicts for shared resources are the cause of delay in 42% of large cross-sectional projects.To avoid such conflicts, ITM Platform allows you to immediately identify over-allocation of all resources in the organization. 

Scenario projections

The ITM Platform methodological tools for defining business objectives and linking them to project execution scenarios are one of the aspects most valued by those who manage project programs. 

Portfolio Evaluation

Aggregated project data allows you to carry out a continuous evaluation of your portfolio with the required periodicity. From the moment that your entire project team is using the same tool to plan and execute projects to carry out portfolio tracking, you can say goodbye to tedious periodic portfolio evaluations that stretch over months. It will be sufficient to extract data from ITM Platform to discuss with your team.

Project Managers

The possibility of combining predictive projects with agile methodologies allows different relationships to coexist between customers the development of products and results within a single unified portfolio based on shared financial management and resources.To top it off, project managers benefit from a user experience optimized for the integration of projects from menus that are always visible and easy to navigate.

Analysts and team members

Team members with no planning and control responsibilities should only enter the progress data of their tasks on the ITM Platform. For this, they have different auxiliary interfaces that save time and increase their productivity:

  • Mobile App on Android and MacOS. Report the time worked on a task. It is a fundamental support tool for those who are out and about or working remotely.
  • The ITM Platform teambot. The integration of ITM Platform with Slack is designed to aid personal productivity, as it allows each team member to track the tasks in which they are involved and report progress with simple commands such as “/itmplatform list tasks”
  • In addition, software development teams working with JIRA for issue management can connect these with their ITM Platform projects to manage their portfolio from their preferred environment.

4. Align project management and portfolio planning

Project management software can be divided into three broad sections: task managers and teams; project planners; and portfolio managers. Few tools can find the balance between these three areas. This is where ITM Platform stands out precisely because our obsession is to optimize the return of the projects from the first minute, with little to no barriers of entry.

Receive the latest blogs directly into your inbox

 

unicorn on black backgroundToo much innovation can be bad

Innovation is dangerous. Despite the many benefits of marketing new products and services, it is important for any private organization not to underestimate the complications of practicing innovation on a day to day basis. In short, for a private organization with limited resources, too much innovation without sufficient control, can quickly lead to disaster.

Start managing your innovative projects in a unified portfolio with ITM Platform 

Innovative ideas are, by definition, very risky. When you launch an innovative project, the future, the success and acceptance in the market, and often the technical difficulties for its development are unknown.

Solution: portfolio management of innovative projects

Over time, some innovative projects will fail, while others will succeed, they will come to market and may even become established.

This means that, in order to achieve successful innovation, it is imperative to fail, close defective projects, expose oneself to risk and, ultimately, lose financial resources that will not produce results.

So that the risk of innovation does not overwhelm your organization, it is essential to treat innovative projects as a portfolio that is managed according to unified criteria. Therefore the team that manages the portfolio has the important task of monitoring the organization's innovative projects.

Responsibilities include the following:

  • Demand a clear business argument about the commercial feasibility of the development and its relationship with the needs of customers.
  • When there are no spontaneous candidates for innovation, it is essential to request new proposals in the strategic directions and areas that have been identified.
  • Establish evaluation criteria for proposals.
  • Evaluate the proposals, discarding those that are too risky or do not promise sufficient benefits.
  • Decide investment limits for innovative projects, as well as total risk capacity.
  • Compose a balanced portfolio.
  • Coordinate the management of projects that make up the portfolio, especially in the case of shared resources.

How to monitor a portfolio of innovative projects?

When composing the portfolio and with a view of monitoring innovation, it is important to:

  • Have an appropriate balance between different types of projects, such as small technical innovations that improve an existing product or totally new products and services; and types and levels of risk.
  • In addition, it is essential that innovative projects are not linked to each other and can fail or continue independently. Otherwise, if projects share risks and have dependencies, failure in a component could have an impact on the whole portfolio. The fundamental idea of ​​a balanced portfolio is diversification and experimentation: that each project has its own life.
  • Achieve a number of projects low enough to be feasible with available resources (which will often be shared) and high enough to allow the introduction of new products and an interesting flow of projects for the portfolio's half-yearly and annual evaluations.

Evaluation of innovative projects

As we indicated above, in order to evaluate innovative projects and decide whether to keep them in the organization’s portfolio, it is important to define a series of benchmarks. Although it will depend on the sector and the characteristics of each entity, some typical criteria are:

  • Estimated cost
  • Development time
  • Critical resource consumption
  • Alignment with the strategic factors of the organization
  • Innovative and differential character
  • Technical success probabilities
  • Commercial success probabilities
  • Ease of imitation by competitors

Once the criteria are selected, it is important that they be assigned a weighting that allows final estimates to be made. The relative weight of each factor is usually a measure of the organization's situation. For example, in consulting firms that rely on networks of collaborators, the consumption of critical resources will be of little importance, whereas the limitation of development time may have more weight than in other more stable organizations, where innovative projects can be developed with stability over the years.

The score is a good estimate of the value of the project. However, the viability of an innovative portfolio depends on special attention to the composition of its risks. Therefore, beyond that final score reached by the projects based on the selected criteria, it is recommended that the composition of the portfolio of innovative projects make use of an assessment matrix.

The assessment matrix of innovative projects

Many of our readers are already familiar with the ITM Platform risk assessment matrix. The evaluation of innovative projects allows a completely analogous technique to be used.

In the assessment matrix of innovative projects two variables appear:

  • Expected commercial return of the project
  • Risk level

returns/risk

Ideally, all projects will be placed in the upper left quadrant of the matrix, they may be scarce and there may be many projects in the balanced quadrants marked in blue (where returns are proportional to risks).

Bearing in mind that it is good practice to include projects of different types with different levels of risk and knowing that, no matter what we do, some of the innovations will not be successful, a good result is the allocation of the project budget with Percentages that follow a proportion like that of the illustration.

percentages in rectangles

From the location of innovative projects in the matrix and their combination with the punctuation according to the criteria listed above, it should be much easier to make the final decision about which proposals to accept and which to discard.

Innovation will remain risky; but well-organized monitoring will increase the organization's chances of success and learning, with the potential to turn unsuccessful projects into better, more ambitious proposals in line with the pulse of the market.